Much has been written and said re the performance of the South Gippsland Shire and its staff. Well, a few words of thanks are required.

At approximately 9.15am Monday, January 18, I phoned the shire to report some maintenance that was needed for Withalls Road, Ruby.

At about 1pm, machinery arrived, the road was reformed, drains cleaned out and runoffs made viable again. At approximately 4pm, shire phoned (Chris) and advised that stone would be spread ASAP. By Wednesday, January 20 – job done to a high standard.

Thank you, well done to all concerned.

Ken and Lyn Boromeo, Ruby